Question # 41

Loading docks and generators are planned near one façade. What design tactic best protects indoor air quality?

Options:

A.

Place outdoor air intakes near loading docks for short duct runs

B.

Locate outdoor air intakes away from contamination sources and grade, separate exhaust/combustion discharges from intakes, use appropriate filtration, and maintain pressure relationships

C.

Open operable windows near docks for dilution

D.

Rely on ionization devices to neutralize pollutants

Question # 42

Value engineering threatens to remove high-impact sustainability features late in design. Which practice best protects performance outcomes?

Options:

A.

Accept substitutions if first cost is lower, regardless of lifecycle impacts

B.

Lock measurable performance targets in the OPR/BOD, require lifecycle cost analysis for proposed changes, and embed performance criteria in specs and bid alternates

C.

Ask contractors to propose “equal” products without constraints

D.

Wait for post-occupancy surveys to determine if the cuts were harmful

Question # 43

After receiving a Final Review determination, the team believes one denied credit can be earned with additional, project-specific evidence. What’s the correct next step?

Options:

A.

Email the reviewer directly to reconsider without formalities

B.

Submit an Appeal Review through LEED Online with the required fee and only the focused, new documentation that addresses the denial

C.

Re-register the project to reset the review cycle

D.

Upload all project files again and mark them “Revised”

Question # 44

A city office wants a lightweight, lasting program to inform the public about the building’s green features. What should they deploy?

Options:

A.

A single press release and a plaque in the lobby

B.

Weather-resistant interpretive signage at visible features (rain gardens, PV, shading), QR codes to short plain-language web pages with periodic updates, and a small lobby display of high-level energy/water trends

C.

Technical dashboards on every floor

D.

Guided tours by appointment only

Question # 45

Which combined strategy most effectively addresses heat island effects for both roofs and nonroof areas?

Options:

A.

Dark membranes on roofs and standard asphalt paving

B.

High-reflectance and/or vegetated roofs, extensive tree/shade canopies, and light-colored/permeable pavements; covered parking where feasible

C.

Increase building height to cast longer shadows on neighboring parcels

D.

Use decorative dark pavers to enhance aesthetics

Viewing question 9 out of 15 questions


Go to LEED Green Associate Exam Main Page

Don't just take our word for it. Industry research shows that targeted LEED Green Associate practice test dramatically increases pass rates for the LEED Green Associate. Our platform is built on this principle, offering the most realistic simulations available to give you that proven advantage.


LEED Green Associate Overview

Name LEED Green Associate
Code LEED Green Associate
Vendor Professional
Certification USGBC

Our free LEED Green Associate exam questions are your personalized diagnostic tool. Get an instant, honest snapshot of your readiness for the LEED Green Associate certification exam and identify the specific topics that need your focus.

LEED Green Associate Questions

What You Get with Full Access:

Complete Questions Bank

Timed Exam Simulator

Smart Performance Dashboard

Identify Weak Spots

Verified Answer & Explanations

Unlimited Reattempts

Mobile-Friendly Study

Regular Content Updates



1 Month Access

$19.99

Buy Now


12 Months Access

$49.99

Buy Now

LEED Green Associate Complete Package

Choose a plan and prepare with realistic LEED Green Associate practice exam designed to mirror test-day conditions. Every plan includes a full LEED Green Associate question bank, a timed exam simulator, performance tracking, detailed answer explanations, and the ability to reattempt questions to improve accuracy and confidence.

284 Practice Questions - Flexible Quiz Modes - Unlimited Attempts