LARE Questions 11-20 of 80 free
0/10 answered · 0 correct

Choose an answer and click Check answer to see if you're right, with the full explanation.

Question 11

Which feature captures stormwater, treats pollutants, and supports vegetation?

Correct answer: A

Explanation

Bioretention cells use engineered soil and plants to filter pollutants and promote infiltration. Concrete channels (Option B) and manholes (Option C) only convey water. Headwalls (Option D) stabilize culverts but provide no treatment. Bioretention exemplifies green infrastructure, a priority in stormwater design under L.A.R.E. Section 4.

Question 12

Which task occurs earliest in project scheduling?

Correct answer: A

Explanation

Early scheduling requires sequencing tasks, identifying dependencies, and establishing the critical path. Punch lists (Option B), shop drawings (Option C), and pay applications (Option D) occur during construction or closeout. Critical path analysis ensures realistic scheduling, aligning resources with priorities—core project management knowledge tested in the L.A.R.E.

Question 13

Which condition most necessitates the use of an underdrain in a bioretention cell?

Correct answer: B

Explanation

In poorly draining soils (clays), underdrains are installed in bioretention cells to prevent prolonged ponding, maintain plant health, and ensure hydraulic function. Sandy soils (Option A) infiltrate well without underdrains. Steep slopes (Option C) influence layout but not necessarily underdrain needs. Lack of vegetation (Option D) undermines treatment, but underdrains specifically address soil permeability. Recognizing when to use underdrains is vital for stormwater BMP design tested in L.A.R.E. Section 4.

Question 14

While preparing bid documents for a plaza, which specification section would you use to define submittal procedures, quality assurance, and closeout requirements applicable to all trades?

Correct answer: A

Explanation

Construction specifications are organized by MasterFormat divisions. Division 01—General Requirements—establishes administrative and procedural standards applicable across disciplines: submittal schedules, substitution protocols, mockups, testing/inspection requirements, temporary facilities, measurement and payment, and project closeout including O&M manuals and warranties. Setting these expectations in Division 01 provides consistency across technical sections and the drawings, thereby reducing conflicts and ambiguities during bidding and construction. Division 32 (Option B) contains site-related technical specifications for pavements, planting, site furnishings, and irrigation, but does not govern overall administrative processes. Division 03 (Option C) is specific to concrete materials, reinforcement, finishes, and execution. Division 31 (Option D) addresses site preparation and earthwork details such as excavation and compaction. For comprehensive, cross-cutting requirements that guide submittals, QA/QC, and closeout, Division 01 is the appropriate locus within Construction Documentation and Administration.

Question 15

Which document formally transmits information between design team and contractor to maintain records?

Correct answer: A

Explanation

A transmittal form documents the sending of drawings, specifications, RFIs, or other records, maintaining clear communication. Punch lists (Option B) note deficiencies. Submittals (Option C) propose products for approval. Field reports (Option D) describe conditions observed. Transmittals create a paper trail, essential in Construction Documentation and Administration for accountability and dispute prevention in the L.A.R.E.

Question 16

Which document officially closes out the project after all punch list items are addressed?

Correct answer: A

Explanation

The Final Certificate for Payment confirms all work is complete, punch list items resolved, and warranties submitted, authorizing final payment. Submittal logs (Option B) track reviews. Addenda (Option C) are pre-bid clarifications. Field reports (Option D) record site observations. The final certificate marks contractual completion, a core Construction Documentation and Administration duty in the L.A.R.E.

Question 17

You are evaluating pedestrian circulation for a mixed-use streetscape retrofit. Which design move most improves comfort and safety without reducing storefront visibility?

Correct answer: B

Explanation

A continuous allée of high-canopy street trees provides shade, reduces radiant heat, and frames the pedestrian realm while preserving sightlines to storefronts. Combined with curb extensions (bulb-outs) at intersections, crossing distances are shortened, yielding traffic-calming benefits and increased pedestrian visibility. Trees also create a vertical edge that psychologically narrows the roadway, prompting slower vehicle speeds. Hedging (Option A) or privacy fences (Option D) can impede sightlines, diminish perceived safety, and conflict with CPTED principles. Eliminating on-street parking to widen travel lanes (Option C) typically increases vehicular speeds and reduces pedestrian comfort. The selected approach integrates human-scale design, ADA considerations, and multimodal safety—core Planning and Design objectives.

Question 18

Which project management tool shows tasks, responsibilities, and deadlines in a single document?

Correct answer: B

Explanation

A RACI matrix clarifies who is Responsible, Accountable, Consulted, and Informed for each task, linking responsibilities with timelines. Project charters (Option A) establish scope and authority but not detailed responsibilities. Risk registers (Option C) track risks, not roles. Meeting minutes (Option D) summarize discussions but not accountability. The RACI ensures clear communication and accountability, central to project management practices emphasized in the L.A.R.E. exam.

Question 19

Which design feature slows runoff and encourages infiltration along streetscapes?

Correct answer: A

Explanation

Bioswales capture runoff through curb cuts, allowing infiltration, filtration, and pollutant removal. Continuous curbs (Option B) block infiltration. Smooth concrete channels (Option C) and oversized sewers (Option D) only convey runoff. Bioswales are green infrastructure BMPs tested in L.A.R.E. Section 4, exemplifying sustainable stormwater design.

Question 20

A municipality asks you to create a scope, schedule, and budget for a neighborhood park renovation. Which deliverable most appropriately defines task durations, dependencies, and critical path before design begins?

Correct answer: A

Explanation

Before design activity ramps up, the project manager must establish a planning framework that sequences tasks, allocates resources, and identifies schedule risk. A Work Breakdown Structure (WBS) decomposes the project into discrete, manageable packages (e.g., data collection, public engagement sessions, concept alternatives, cost estimation, and permitting). Pairing the WBS with a Gantt chart displays durations, start/finish dates, and dependencies, which enables identification of the critical path—the chain of activities whose delay will extend the overall schedule. This planning tool also supports earned value tracking and facilitates communication with the client and subconsultants. A design development cost estimate (Option B) is appropriate later, after concepts are defined. A change order log (Option C) is a construction-phase instrument used to track scope, time, and cost amendments to the contract. A final punch list (Option D) is a closeout document focused on minor corrective work at substantial completion. Therefore, for initial project organization and schedule control in the inventory and analysis phase, the WBS paired with a Gantt chart is the correct choice.

0%

Your score on this page: 0/0

Answer the questions above to see your score.

0 of 80 free LARE questions practiced · - overall accuracy

Want the full LARE question bank?

Unlock all 241 questions with mock exam, explanations for every option and domain-level analytics.

Page 2 of 8 · Questions 11-20 of 80 free

PracticeTestMaster is an independent exam prep provider. LARE is the property of Council of Landscape Architectural Registration Boards (CLARB).

Full access

Unlock all 241 LARE questions

You're practicing 80 free questions. Paid plans add:

  • 161 more exam-style questions
  • Timed mock exam simulations
  • Domain-level score analytics
  • Unlimited reattempts
1 Month $19.99
Buy
12 Months $49.99
Buy
See everything included

Your LARE progress

Questions answered0
Accuracy-

Saved on this device.

LARE exam overview

Exam
Landscape Architect Registration
Code
LARE
Credential body
Council of Landscape Architectural Registration Boards (CLARB)
Updated
Nov 24, 2026
Unlock all 241 questionsFrom $19.99
Unlock